Project Background
Background
For more information about Keewaytinook Okimakanak and K-Net, visit www.knet.ca
Diagrams
- 07-01 Meet-Me Thunder Bay Loop Diagram
- 04-06 NAN Tsunami Diagram
- Radio Sector Path Map
- K-Net Network
Meet Me Routing Diagram
Technical Updates
May 22, 2007 Scheduled Meet-Me Down - Ceragon Radio Link Installed (0.5 hrs)
May 7, 2007 Meet-Me Down - Switch Port Failure (6 hrs)
April 5, 2007 Meet-Me Down - Gigalink Power Failure (4 hrs)
October 25, 2006 FWFNO Down - IBM OMNI Base Station Power Failure (12 hrs)
September 13, 2006 ACAS1 Down - Academy Base Station Power Failure (3 hrs)
August 28, 2006 IBM_1 Down - IBM Base Station Power Failure (6 hrs)
July 27, 2006 FWFNO Down - OMNI improper configuration (4 hrs)
Attachment | Size |
---|---|
Meet-Me Loop 07-12.pdf | 211.08 KB |